Hydraulic Lifting Systems since 1981

 

 


Hymach Hymach Industries Ltd. has had extensive experience in designing complete lifting systems and providing lifting services for the following companies and others throughout British Columbia and the Yukon.
Annacis Channel West Connector (New Westminster, BC)
Contractor: Mainroad Contracting
  • Design of Jacking Procedure Installation of Hydraulic Equipment
  • Lift & Lowering Procedure
Annacis Island Swing Bridge (New Westminster, BC)
Contractor: Mainroad Contracting
  • Provide Hydraulic EquipmentLift & Remove Gear Boxes
  • Lift for Main Bearing Replacement
Beaver Creek Bridge (Beaver Creek, Yukon)
Contractor: Ketza Construction
  • Provsion of all Hydraulic Equipment Required to Slide Bridge Into New Location
  • All Sliding Operations Provided by Hymach Industries
Black Creek Bungee Bridge (Whistler, BC)
Contractor: Bosman Steelworks
  • Responsible for Lifting the Bridge Into Position on the Piers Once the New Structure was Launched
  • Responsible for Aligning the Launched Section Enabling Pin Placement
Bridge over Barrier River (Barriere, BC)
Contractor: CN Rail
  • Design Hydraulic Jacking System Including all Ancillary Components, Jacking ChairsProvide Jacking Procedure, Installation and Removal and Equipment
  • Lift and Lowering Procedures
Brilliant Bridge (Castlegar, BC)
Contractor: Emcon Services
  • Provide Jacking ProcedureInstall Hydraulic Equipment
  • Lift & Lowering Operations
CN Rail - Fraser River Swing Bridge
Contractor: CN
  • Design Hydraulic Jacking Chairs, Provide Jacking ProcedureInstall Hydraulic Equipment
  • Supervise & Perform Lift and Lowering Procedures
Colbrook Bridge (Surrey, BC)
Contractor: Seismic 2000 Construction
  • Responsible for the Design, Fabrication & Installation of Jacking Chairs and Bearing SupportInstallation of Hydraulic Equipment
  • Lift & Lower Procedures
Culliton Creek Bridge (Squamish, BC)
Contractor: Walter Construction
  • Responsible for the Design of the Hydraulic Jacking System Including Jacking Chairs
  • Provide Jacking Procedure/ Installation of Equipment/ Lift & Lowering Procedures
Donald Bridge (Golden, BC)
Contractor: VSA Highways Maintenance
  • Responsible for the Design, Fabrication & Installation of Jacking Chairs and Bearing SupportInstallation of Hydraulic Equipment
  • Lift & Lower Procedures

Fiva Creek Bridge (Rock Creek, BC)
Contractor: Seismic 2000 Construction

  • Install Jacking Equipment/ Lift Bridge & Laterally Skid Bridge 25’
Gordon Creek Bridge (Hope, BC)
Contractor: Newport Structures
  • Provide Jacking ProcedureProvide Hydraulic Equipment & Installation
  • Lift & Lowering Procedures
Guichon Bridge (Merrit, BC)
Contractor: VSA Highways Maintenance
  • Design Hydraulic Jacking SystemFabrication and Installation of Jacking "Collars" (Wooden Structure)
  • All Lift & Lowering Procedures
Highland Valley Copper (Kamloops, BC)
Contractor: Newport Structures
  • Design, Fabrication & Installation of all Hydraulic Components Required for Jacking of 2D Conveyor
  • Lift & Lower Procedures
Institute of Oceans & Sciences (Sidney, BC)
Contractor: Seismic 2000 Construction
  • Responsible for the Methodology, Design and Installation of Hydraulic Equipment required to Perform Pier Lift
  • Perform lift & lower procedures
John Hart Bridge (Prince George, BC)
Contractor: Surespan Construction (Note – Post-Tensioning Application)
  • Provide Hydraulic Components
Kingsgate Bridge (Cranbrook, BC)
Mainroad Contracting Kootenay
  • Responsible for the Design of Hydraulic Jacking System Including Jacking Chairs/ Lateral Displacement Frame/ Provide Jacking Procedure/ Installation of Equipment/ Lifting & Lowering Procedure
Knight Street Bridge (Richmond, BC)
Contractor: Surespan Construction
  • Provide Jacking Procedure & Hydraulic Equipment
Lions Gate Bridge (North Vancouver, BC)
Contractor: American Bridge/ Surespan A Joint Venture
  • Responsible for the Design, Fabrication & Installation of all Hydraulic Components on the "Jacking Traveler"
Middle Arm Swing Bridge (Richmond, BC)
Contractor: Mainroad Contracting
  • Provide Hydraulic Equipment & Lift Bridge to Facilitate Main Bearing Repairs
Middle Arm Swing Bridge (Richmond, BC)
Contractor: Mainroad Contracting
  • Responsible for the Removal/ Re-manufacture/ Re-Installation of Main Swing Cylinders
Nechako River Bridge (Houston, BC)
Contractor: Min. of Transport & Highways
  • Provide Hydraulic Equipment/ Lift & Lowering Procedures
Nine Mile Canyon Bridge (Boston Bar, BC)
Contractor: Seismic 2000 Construction
  • Responsible for the Design of Hydraulic Jacking System Including Jacking Chairs and Lateral Displacement SystemInstallation of Equipment
  • Lift & Lowering Procedures
Pete Wolf Creek Bridge Replacement (Sooke, BC)
Contractor: Precision Civil Installations
  • Design, Fabrication & Installation of Lateral SupportDesign of Jacking ProcedureInstallation of Hydraulic Equipment
  • Lift & Lower Procedures
Point Ellice (Bay Street) Bridge (Victoria, BC)
Contractor: Seismic 2000 Construction
  • Design & Installation of Lateral Support Structure & Installation of Hydraulic Components
  • Lift & Lower Procedures
Ryan Bridge (Cranbrook, BC)
Contractor: Mainroad Contracting Kootenay
  • Responsible for the Design of the Hydraulic Jacking System Including Jacking Chairs/ Provide Jacking Procedure/ Installation of Equipment/ Lifting & Lowering Procedures
Savona (Savona River Bridge) (Savona, BC)
Contractor: CN Rail
  • Design Hydraulic Jacking System Including all Ancillary Components, Jacking ChairsProvide Jacking Procedure, Installation and Removal and Equipment
  • Lift and Lowering Procedures
Second Narrows (Ironworkers Memorial) Bridge (North Vancouver, BC)
Contractor: Surespan Construction
  • Supervise Equipment Installation
  • Lift & Lowering Procedures
Southern Rail Bridge (New Westminster, BC)
Contractor: Mainroad Contracting
  • Conversion of Mechanical Rail Bridge to HydraulicsResponsible for System Specification and DesignInstallation of Hydraulic and Electrical Components
  • Commissioning of System
Spences Bridge (Spences Bridge, BC)
Contractor: Coquitlam Ridge Construction
  • Design Hydraulic Jacking System Including all Ancillary Components, Jacking ChairsProvide Jacking Procedure, Installation and Removal and Equipment
  • Lift and Lowering Procedures
Teslin River Bridge (Whitehorse, Yukon)
Contractor: Ketza Construction
  • Design Hydraulic Jacking System Including all Ancillary Components, Jacking ChairsProvide Jacking Procedure, Installation of Fabricated and Hydraulic Equipment
  • Lift and Lowering Procedures
Third Canyon Creek Bridge (Clearwater, BC)
Contractor: PCI Installations
  • Provide Jacking Procedure
  • Lift Bridge/ Change Bearings/ Lower Bridge
Three Mile Bridge (Merrit, BC)
Contractor: VSA Highways Maintenance
  • Design Hydraulic Jacking System Including all Ancillary ComponentsProvide Jacking Procedure, Installation and Removal and Equipment
  • Lift and Lowering Procedures
Tsable River Bridge (Nanaimo, BC)
Contractor: Walter & SCI Construction
  • Spec. in Hydraulic Equipment Required
  • Provide Equipment Required
Westholme Overpass (Duncan, BC)
Contractor: Seismic 2000 Construction
  • Jacking Procedure & Installation of Hydraulic Components
  • Lift & Lowering Procedure

Site4 Jacking Traveler
on Lions Gate Bridge, Vancouver, Canada
Modifications to Jacking Traveler
Lions Gate Bridge, Vancouver, Canada
Site5
Site2 Annacis Channel West Connector Bridge
Annacis Channel West Connector Bridge
Annacis
BayStreet

Point Ellice (Bay Street) Bridge

e

uh

uh